By examining the issue of the electrical power distribution system's dependability, particularly on the outer islands, in this case Pulau Panjang, it can be seen that the usage of electrical energy in Indonesia is still predominantly controlled by steam power plants. It is discovered that the Diesel Power Plant is this location's primary source of electrical energy. Since 2019, the use of PLTD has been running continuously here, with four primary engines operating efficiently. However, each day, only two machines run alternately for 12 hours, raising a reliability concern that has to be looked into. The SAIDI and SAIFI values obtained using these approaches are extremely high (403,645 for SAIDI and 16 for SAIFI), Then, it was claimed that an index comparison based on SPLN 68-2: 1986, IEEE, and WCS as of January 2022 to June 2022 was erroneous. Thus, the installation of PLTS in the Long Island region is required as a substitute for electrical energy. In order to achieve optimal performance, the diesel working time limit is decreased using the PLTS technology

Downloads

Download data is not yet available.

Article Details

How to Cite
Samsurizal, S., & Putra, A. (2023). Keandalan Jaringan Distribusi Di Pulau Panjang Dengan Pembangkit Listrik Tenaga Diesel. SUTET, 13(1), 23–34. https://doi.org/10.33322/sutet.v13i1.1850
Section
Articles

References

Ali, B., & Nugroho, P. A. (2017). analisis pemakaian bahan bakar high speed dieseldan biodiesel (b30) terhadap konsumsi bahan bakar dan emisi gas buang mesin diesel pltd 1.4 mw.

Cekum, A., Junaidi, & Purwoharjono. (2019). studi keandalan pembangkit listrik tenaga diesel (pltd) sukaharja.

Gagani, P., & hilal, H. (2016 Vol 1 NO 1). Analisa Pembangkit listrik Tenaga Hybrid PLTD-PLTS Di Pulau Tunda Serang Banten.

Hayatullah, W., Putra, S., Fajar, Rachman, M., & faeshol, M. (2021). Analisis Performa Generator Set Diesel PLTD Terhadap Perubahan Beban di Pusat .

Ir. Erhaneli, M. (2011). Diktat Kuliah Distribusi Tenaga Listrik. Teknik Elektro Institut Teknologi Padang. Padang.

Kadir, A. (2004). Distribus dan Utilisasi tenaga listrik.

Marsudi, D. (2005). Pembangkit energi listrik. Erlangga.

Rakhman, A. (2021). Cara Kerja Pembangkit Listrik Tenaga Diesel.

suherman, A., Tri, W., salmah, A., & Rosdiansyah. (2017 Vol 3 NO 1). Studi Kelayakan Pembangkit Listrik Tenaga Hibrida di Pulau Panjang.

Tanjung, A. (2012 (2085-9902)). Analisis Sistem Distribusi 20 kV untun memperbaiki kinerja dan keandalan sistem distribusi menggunakan Electrical Transient Program.

Wahyudi, D. (2018). evaluasu keandalan sistem distribusi tenaga listrik berdasarkan saidi dan saifi pada PT.PLN (persero) rayon kakap.

Wiryadinata, R., Imron, A., & munarto, R. (2013 Vol 2 NO 1). Studi Pemanfaatan Energi Matahari di Pulau Panjang.

Most read articles by the same author(s)