Analisis Hasil Uji Pembangkit Listrik Hybrid Turbin Angin 1kWh Dan Panel Surya 100 WP

Main Article Content

Hastuti Aziz
Pawenary IPM
Meyhart Bangkit Sitorus

Abstract

Electrification ratios in some isolated regions and scattered islands in Indonesia are still very low. Until now, most of the electricity needs in Indonesia are still supplied by Diesel Power Plants (PLTD) that use fossil energy as their main fuel. There fore, the use of renewable energy is needed as one of the steps in meeting electricity needs. In this study will be studied about Hybrid Power Generators that utilize wind energy or wind using low speed turbine hybrid by utilizing solar energy using solar panels as an alternative to meet the needs of electrical energy in isolated areas and islands outermost in Indonesia. Testing is done on a small scale. The results obtained from the efficiency of the hybrid system are still less than 30%, namely 11.2% which shows poor performance. The total electricity produced per day is 2.7 kWh.

Downloads

Download data is not yet available.

Article Details

How to Cite
Aziz, H., IPM, P., & Sitorus, M. B. (2019). Analisis Hasil Uji Pembangkit Listrik Hybrid Turbin Angin 1kWh Dan Panel Surya 100 WP. SUTET, 9(1), 16–25. https://doi.org/10.33322/sutet.v9i1.384
Section
Articles