Rotor Position PLTGU 1.1 UP Muara Tawar
Main Article Content
Abstract
Maintenance of generating units is done regularly based on specific operating hours and in various types of maintenance, inspections and overhauls. Each overhoul performed and maintenance unit is not operating in the maintenance period. Thus the implementation of maintenance should be done as effectively and efficiently as possible. Rotor position one of the activities in overhoul that much help and determine the smoothness pealaksanaan overhoul. With peaksanaannya smooth and maximum results will help peaksanaan other activities so that implementation can overhoul more effective and targeted.
Downloads
Download data is not yet available.
Article Details
How to Cite
Sahlan, S., Erlina, E., & Yulistyo, P. (2019). Rotor Position PLTGU 1.1 UP Muara Tawar. JURNAL POWERPLANT, 4(1), 49–53. https://doi.org/10.33322/powerplant.v4i1.836
Section
Articles
References
ABB power generation Ltd .Assembly instruction calculation of rotor position. Revisi D/98-07-10.
ABB Power generation Ltd. Maintenance manual gas turbine. CH-5401. Baden /Swizerland. 1988.
Alsthom. Gas Turbine routine operational procedure for GT13e2. 2006. Alsthomswitszerland ltd. Braden
P.T PLN (persero) Jasa Diklat Udiklat Suralaya. Pelatihan Pemeliharaan turbin gas.
ABB Power generation Ltd. Maintenance manual gas turbine. CH-5401. Baden /Swizerland. 1988.
Alsthom. Gas Turbine routine operational procedure for GT13e2. 2006. Alsthomswitszerland ltd. Braden
P.T PLN (persero) Jasa Diklat Udiklat Suralaya. Pelatihan Pemeliharaan turbin gas.