The success of a project can be measured on two things, namely the benefits and timelines of the project
completion (Soeharto,1997). Both depend on careful planning of the implementation method of use and
scheduling tool. The implementation of construction is working using heavy equipment required accurate
planning in order to achieve a project with costs and optimal execution time. Therefore, an analysis of the
usage of heavy equipment used is needed, so it can produce proper alternative heavy equipment for the
construction project. On the development project district 8 Senopati apartments and office tower, South
Jakarta found a problem on one of the tower crane static productivity because it is considered to have a small
and minimal availability section that takes a long time for jacking up, of course, it impedes the progress of the
project, to overcome, the most appropriate step is to move and transform these into climbing tower crane.
This research will analyze the most effective position for the tower crane climbing, then the beam must be
checked if it is must be redesigned. After the analysis concluded that the static tower crane converted into a
climbing tower crane void switching positions in buildings area with a beam analysis does not require special