Nurhasanah, R. and Firdaus, O. (2019) “Perbandingan Efisiensi Boiler Awal Operasi Dan Setelah Overhaul Terakhir Di Unit 5 PLTU Suralaya”, JURNAL POWERPLANT, 4(1), pp. 44–48. doi: 10.33322/powerplant.v4i1.835.