Operation of Steam Power (power plant) is highly dependent on the thermal efficiency as a reliability parameter unit. PJB is required to operate and maintain the power plants with world-class quality standards, and is able to maintain the efficiency of the work unit to keep it in optimum condition. In this study used a method in which the actions of this method has the objective to develop the skills, checking, analysis and influence the fuel consumption of the primary to the efficiency of Paiton # 2 due to the application of the inspection work at high pressure heater is no.7.The goal of operate back HPH 7 performance optimal, and calculate the rate of heat transfer coefficient on the concession system.
Downloads
Download data is not yet available.
Article Details
How to Cite
Rosyid, H. A., & Pusipto, W. A. (2019). Analisis Kerugian Out Service High Pressure Heater No.7 Pada PLTU Paiton Unit 2. JURNAL POWERPLANT, 2(2). https://doi.org/10.33322/powerplant.v2i2.812
Section
Articles
References
Corporation, Marubeni. “Maintenance Manual Book Suralaya Steam Power Plant 1&2”. Bristol, Canada: Perusahaan Umum Listrik Negara. 1984
Corporation, Marubeni. “Design Manual Book Suralaya Steam Power Plant 1&2”. Bristol, Canada: Perusahaan Umum Listrik Negara. 1984
Degarmo, E. Paul; Black, J T.; Kohser, Ronald A. “Materials and Processes in Manufacturing”. Edition 9th. Wiley. ISBN 0-47165653-4. 2003
General Electric, Heavy Duty Gas Turbine Service Manual, Turbines Accessories and Generator, Volume I, Tahun 1992.
General Electric, MS9001E Gas Turbine-Generator Operation Training, PLN/Sumitomo Tambak Lorok Semarang, Tahun 1993.
Gilman, G. F., Gilman, Jerry. “Boiler Control Systems Engineering”. Second Edition. ISA. 2010
Setia, Freddy., Safii, Alfian. “Analisa Perbandingan Perpindahan Panas Pipa Sootblower dalam Kondisi Tanpa Insulator dan Menggunakan Insulator Unit 1-4”. Jakarta: Politeknik Negeri Jakarta. 2011.
Suharno, Bambang & Sri Harjanto. Bahan Kuliah Baja Paduan dan Paduan Super. “Heat Resistant Steel”. Departemen Teknik Metalurgi dan Material FTUI. 2010
Corporation, Marubeni. “Design Manual Book Suralaya Steam Power Plant 1&2”. Bristol, Canada: Perusahaan Umum Listrik Negara. 1984
Degarmo, E. Paul; Black, J T.; Kohser, Ronald A. “Materials and Processes in Manufacturing”. Edition 9th. Wiley. ISBN 0-47165653-4. 2003
General Electric, Heavy Duty Gas Turbine Service Manual, Turbines Accessories and Generator, Volume I, Tahun 1992.
General Electric, MS9001E Gas Turbine-Generator Operation Training, PLN/Sumitomo Tambak Lorok Semarang, Tahun 1993.
Gilman, G. F., Gilman, Jerry. “Boiler Control Systems Engineering”. Second Edition. ISA. 2010
Setia, Freddy., Safii, Alfian. “Analisa Perbandingan Perpindahan Panas Pipa Sootblower dalam Kondisi Tanpa Insulator dan Menggunakan Insulator Unit 1-4”. Jakarta: Politeknik Negeri Jakarta. 2011.
Suharno, Bambang & Sri Harjanto. Bahan Kuliah Baja Paduan dan Paduan Super. “Heat Resistant Steel”. Departemen Teknik Metalurgi dan Material FTUI. 2010