Perbedaan Pelaksanaan Terhadap Perencanaan Dan Cara Mengatasinya Pada Proyek Konstruksi

Main Article Content

Gita Puspa Artiani
Fajar Eka Surya

Abstract

Problems on the construction project going on for many things, but the cause that often arises is the difference in the implementation of the planning of the field, causing a large increase in funding costs. Their main work items that are not entered into the budget plan, and there are differences of specifications in the plans designed by the consultant is one of the problems that occur. This research was conducted by two methods, namely quantitative data collection Budget Plan in the form of data, and the data volume deviation value-added jobs. Then do the data collecting qualitative data collection questionnaire with interview preventive and corrective actions to address and prevent these problems happening in future hari.Hasil study showed an increase in the cost of Rp.444.094.874 up 18% of the value of the contract so that the required solution / settlement on these cost increases. Obtained results of the questionnaire in the form of preventive measures such as: the process of selecting a consultant planner more selective, rigorous monitoring plan when making volume measurements in the field, and double-check the results of the planning. Corrective actions include: held CCO (Contract Change Order), Addendum, plus work less, and hospitalization for selectively on the added job priority

Downloads

Download data is not yet available.

Article Details

How to Cite
Artiani, G. P., & Surya, F. E. (2019). Perbedaan Pelaksanaan Terhadap Perencanaan Dan Cara Mengatasinya Pada Proyek Konstruksi. KILAT, 6(1). https://doi.org/10.33322/kilat.v6i1.663
Section
Articles

References

Anonim, 1999, Undang-Undang Republik Indonesia No 18 Tahun 1999 tentang Jasa Konstruksi. Jakarta.
Anonim.2010. Peraturan PresidenRepublik Indonesia No.54.Th.2010 tentang Pengadaan Barang / Jasa Pemerintah. Jakarta.
Kezner, H. (1982). Project Management For Executives. United States: Van Nostrand Reinhold Company.
Soeharto. 1999.Manajemen Proyek 1. Erlangga. Jakarta.
Soeharto. 2001. Manajemen Proyek 2.Erlangga. Jakarta.
Suswanto, T.V. (2014). Penyebab Dan Cara Mengatasi Kegagalan Proyek Konstruksi Pada Tahap Perencanaan Hingga Pelaksanaan Di Daerah Istimewa Yogyakarta. Yogyakarta: Universitas Atma Jaya Yogyakarta.
UU RI No 18 Tahun 1999 Tentang Jasa Konstruksi
Wahyono, H.L. (2011). Analisis Ketidaksesuaian Kontrak Dalam Kegagalan Konstruksi Dan Kegagalan Bangunan. Semarang: Universitas Diponegoro
Wiyana, Y.E. (2012).Analisis Kegagalan Konstruksi Dan Bangunan Dari Perspektif Faktor Teknis. Semarang: Politeknik Negeri Semarang.