IDENTIFIKASI PENYEBAB RISIKO KETERLAMBATAN PROYEK KONSTRUKSI BANGUNAN GEDUNG TINGGI HUNUIAN (STUDI KASUS : PROYEK PEMBANGUNAN CONDOTEL DAN APARTEMEN BHUVANA RESORT CIAWI, BOGOR)
Main Article Content
Abstract
The construction project of the building is said to be one of the high-risk projects given the weight of work
and the high structures to be built. The possibility of constraints during implementation of the project could
result from resources that do not fit, the constraints of tools and materials, methods and poor management, as
well as nature and the environment that is difficult predict. Then affects the performance time, causing delays
in construction and project work directly detrimental to the owner of the Project and Konstraktor. In
Avoiding the risk of delays, it is necessary to study on the risks of the construction of buildings.By using
quantitative descriptive method, through a questionnaire based on 30 respondents, then the data results of the
questionnaire will be tested instrument using SPSS version 24 and in the analysis based on the PMBOK.
Anlisis of the results and findings of the dominant risk in the project Bhuvana Resort Ciawi, then do a risk
response is based on the advice of experts to address the risks in order to improve the performance time.