IDENTIFIKASI PENGARUH PENGGUNAAN RAIL CLIMBING SYSTEM PADA PEKERJAAN KONSTRUKSI COREWALL Retna Kristiana, Afif Hamdani

Main Article Content

Redaksi Tim Jurnal

Abstract

In structural work, especially corewall, the use of conventional formwork systems decreases work effectiveness over time. PT. Total Bangun Persada, one of the stakeholders that applies innovation to increase the effectiveness of that is by using the rail climbing system as a solution to the problems faced. This study will compare the time effectiveness of conventional systems using corewall using the rail climbing system which was analyzed using cyclone to obtain effective repeat cycles. From the two systems, the results show that the corewall work using the rail climbing system is more effective with a work duration of 78 days compared to conventional system formwork with 84 days of work duration.

Downloads

Download data is not yet available.

Article Details

Section
Articles

References

[1] Dony Azhari. (2014). Metode Pelaksanaan Pekerjaan Core Wall Pembangunan Proyek Apartemen Skyland City Rose In Spring Jatinangor Pt. Pp (Persero) Tbk. - Cabang IV. Yogyakarta.
[2] Joni Hardi. (2014). Teknologi Bangunan III Pusat Pengembangan Bahan Ajar-Universitas Mercu Buana, Jakarta
[3] Mawardi Amin & Tatang Korniawan. (2016). Analisis Produktifitas pekerjaan Instalasi façade curtain wall unitized system pada proyek high-rise building dengan metode simulasi operasi konstruksi berulang (Cyclone)
[4] Muhammad Ihsan. (2015). Pembangunan Add-In Simulasi Operasi Konstruksi Berulang Dengan Teknik Pemodelan Cyclone Pada Microsoft Excel Institut Teknik Bandung, Bandung.
[5] Rachel Chrisanti & Mawardi Amin (2017) . Work Productivity Analysis of Conventional Floor Structure and Hollow Core Floor Panel