Jurnal, R. T. (2018). STUDI KELAYAKAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA UAP 2X50 MW DENGAN MENGGUNAKAN BOILER CIRCULATING FLUIDIZED BED COMBUSTION DI KENDARI, SULSELRABAR: Harun Al Rasyid, Haqimul Batih, Raden Edi Sewandono. ENERGI & KELISTRIKAN, 9(2), 147–156. https://doi.org/10.33322/energi.v9i2.46